lists.openwall.net   lists  /  announce  owl-users  owl-dev  john-users  john-dev  passwdqc-users  yescrypt  popa3d-users  /  oss-security  kernel-hardening  musl  sabotage  tlsify  passwords  /  crypt-dev  xvendor  /  Bugtraq  Full-Disclosure  linux-kernel  linux-netdev  linux-ext4  linux-hardening  linux-cve-announce  PHC 
Open Source and information security mailing list archives
 
Hash Suite: Windows password security audit tool. GUI, reports in PDF.
[<prev] [next>] [<thread-prev] [thread-next>] [day] [month] [year] [list]
Message-Id: <1408611700-9420-4-git-send-email-juri.lelli@arm.com>
Date:	Thu, 21 Aug 2014 10:01:39 +0100
From:	Juri Lelli <juri.lelli@....com>
To:	peterz@...radead.org
Cc:	luca.abeni@...tn.it, rdunlap@...radead.org, mingo@...hat.com,
	henrik@...tad.us, raistlin@...ux.it, juri.lelli@...il.com,
	juri.lelli@....com, linux-doc@...r.kernel.org,
	linux-kernel@...r.kernel.org
Subject: [PATCH v2 3/4] Documentation/scheduler/sched-deadline.txt: improve and clarify AC bits

From: Luca Abeni <luca.abeni@...tn.it>

Admission control is of key importance for SCHED_DEADLINE, since it guarantees
system schedulability (or tells us something about the degree of guarantees
we can provide to the user).

This patch improves and clarifies bits and pieces regarding AC, both for UP
and SMP systems.

Signed-off-by: Luca Abeni <luca.abeni@...tn.it>
Signed-off-by: Juri Lelli <juri.lelli@....com>
Cc: Randy Dunlap <rdunlap@...radead.org>
Cc: Peter Zijlstra <peterz@...radead.org>
Cc: Ingo Molnar <mingo@...hat.com>
Cc: Henrik Austad <henrik@...tad.us>
Cc: Dario Faggioli <raistlin@...ux.it>
Cc: Juri Lelli <juri.lelli@...il.com>
Cc: linux-doc@...r.kernel.org
Cc: linux-kernel@...r.kernel.org
---
 Documentation/scheduler/sched-deadline.txt | 87 +++++++++++++++++++++++++-----
 1 file changed, 73 insertions(+), 14 deletions(-)

diff --git a/Documentation/scheduler/sched-deadline.txt b/Documentation/scheduler/sched-deadline.txt
index 8372c3d..10fc4c4 100644
--- a/Documentation/scheduler/sched-deadline.txt
+++ b/Documentation/scheduler/sched-deadline.txt
@@ -38,16 +38,17 @@ CONTENTS
 ==================
 
  SCHED_DEADLINE uses three parameters, named "runtime", "period", and
- "deadline" to schedule tasks. A SCHED_DEADLINE task is guaranteed to receive
+ "deadline" to schedule tasks. A SCHED_DEADLINE task should receive
  "runtime" microseconds of execution time every "period" microseconds, and
  these "runtime" microseconds are available within "deadline" microseconds
  from the beginning of the period.  In order to implement this behaviour,
  every time the task wakes up, the scheduler computes a "scheduling deadline"
  consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
  scheduled using EDF[1] on these scheduling deadlines (the task with the
- closest scheduling deadline is selected for execution). Notice that this
- guaranteed is respected if a proper "admission control" strategy (see Section
- "4. Bandwidth management") is used.
+ closest scheduling deadline is selected for execution). Notice that the
+ task actually receives "runtime" time units within "deadline" if a proper
+ "admission control" strategy (see Section "4. Bandwidth management") is used
+ (clearly, if the system is overloaded this guarantee cannot be respected).
 
  Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so
  that each task runs for at most its runtime every period, avoiding any
@@ -134,6 +135,48 @@ CONTENTS
  A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
  sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
  d_j = r_j + D, where D is the task's relative deadline.
+ The utilisation of a real-time task is defined as the ratio between its
+ WCET and its period (or minimum inter-arrival time), and represents
+ the fraction of CPU time needed to execute the task.
+
+ If the total utilisation sum_i(WCET_i/P_i) (sum of the utilisations
+ WCET_i/P_i of all the tasks in the system - notice that when considering
+ multiple tasks, the parameters of the i-th one are indicated with the "_i"
+ suffix) is larger than M (with M equal to the number of CPUs), then the
+ system will surely not be able to respect all of the deadlines, and no
+ execution time is guaranteed for non real-time tasks, which risk to be
+ starved by real-time tasks.
+ If, instead, the total utilisation is smaller than M, then non real-time
+ tasks will not be starved and the system might be able to respect all the
+ deadlines.
+ As a matter of fact, in this case it is possible to provide an upper bound
+ for the tardiness (defined as the maximum between 0 and the difference
+ between the finishing time of a job and its absolute deadline).
+ More precisely, it can be proved that using a global EDF scheduler the
+ maximum tardiness of each task is smaller or equal than
+	((M − 1) · WCET_max − WCET_min)/(M − (M − 2) · U_max) + WCET_max
+ where WCET_max = max_i{WCET_i} is the maximum WCET, WCET_min=min_i{WCET_i}
+ is the minimum WCET, and U_max = max_i{WCET_i/P_i} is the maximum utilisation.
+
+ If M=1 (uniprocessor system), or in case of partitioned scheduling (each
+ real-time task is statically assigned to one and only one CPU), then it is
+ possible to formally check if all the deadlines are respected.
+ If D_i = P_i for all tasks, then EDF is able to respect all the deadlines
+ of all the tasks executing on a CPU if and only if the total utilisation
+ of the tasks running on such a CPU is smaller or equal than 1.
+ If D_i != P_i for some task, then it is possible to define the density of
+ a task as C_i/min{D_i,T_i}, and EDF is able to respect all of the deadlines
+ of all the tasks running on a CPU if the sum sum_i C_i/min{D_i,T_i} of the
+ densities of the tasks running on such a CPU is smaller or equal than 1
+ (notice that this condition is only sufficient, and not necessary).
+
+ On multiprocessor systems with global EDF scheduling (non partitioned
+ systems), a sufficient test for schedulability can not be based on the
+ utilisations (it can be shown that task sets with utilisations slightly
+ larger than 1 can miss deadlines regardless of the number of CPUs M).
+ However, as previously stated enforcing that the total utilisation is smaller
+ than M is enough to guarantee that non real-time tasks are not starved and
+ the real-time tasks tardiness has an upper bound.
 
  SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that
  the jobs' deadlines of a task are respected. In order to do this, a task
@@ -163,14 +206,22 @@ CONTENTS
 4. Bandwidth management
 =======================
 
- In order for the -deadline scheduling to be effective and useful, it is
- important to have some method to keep the allocation of the available CPU
- bandwidth to the tasks under control. This is usually called "admission
- control" and if it is not performed at all, no guarantee can be given on
- the actual scheduling of the -deadline tasks.
-
- The interface used to control the fraction of CPU bandwidth that can be
- allocated to -deadline tasks is similar to the one already used for -rt
+ As previously mentioned, in order for the -deadline scheduling to be
+ effective and useful (that is, to be able to provide "runtime" time units
+ within "deadline"), it is important to have some method to keep the allocation
+ of the available fractions of CPU time to the various tasks under control.
+ This is usually called "admission control" and if it is not performed, then
+ no guarantee can be given on the actual scheduling of the -deadline tasks.
+
+ As already stated in Section 3, a necessary condition to be respected to
+ correctly schedule a set of real-time tasks is that the total utilisation
+ is smaller than M. When talking about -deadline tasks, this requires to
+ impose that the sum of the ratio between runtime and period for all tasks
+ is smaller than M. Notice that the ratio runtime/period is equivalent to
+ the utilisation of a "traditional" real-time task, and is also often
+ referred as "bandwidth".
+ The interface used to control the CPU bandwidth that can be allocated
+ to -deadline tasks is similar to the one already used for -rt
  tasks with real-time group scheduling (a.k.a. RT-throttling - see
  Documentation/scheduler/sched-rt-group.txt), and is based on readable/
  writable control files located in procfs (for system wide settings).
@@ -232,8 +283,16 @@ CONTENTS
  950000. With rt_period equal to 1000000, by default, it means that -deadline
  tasks can use at most 95%, multiplied by the number of CPUs that compose the
  root_domain, for each root_domain.
-
- A -deadline task cannot fork.
+ This means that non -deadline tasks will receive at least 5% of the CPU time,
+ and that -deadline tasks will receive their runtime with a guaranteed
+ worst-case delay respect to the "deadline" parameter. If "deadline" = "period"
+ and the cpuset mechanism is used to implement partitioned scheduling (see
+ Section 5), then this simple setting of the bandwidth management is able to
+ deterministically guarantee that -deadline tasks will receive their runtime
+ in a period.
+
+ Finally, notice that in order not to jeopardize this admission control a
+ -deadline task cannot fork.
 
 5. Tasks CPU affinity
 =====================
-- 
2.0.4


--
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@...r.kernel.org
More majordomo info at  http://vger.kernel.org/majordomo-info.html
Please read the FAQ at  http://www.tux.org/lkml/

Powered by blists - more mailing lists

Powered by Openwall GNU/*/Linux Powered by OpenVZ