lists.openwall.net   lists  /  announce  owl-users  owl-dev  john-users  john-dev  passwdqc-users  yescrypt  popa3d-users  /  oss-security  kernel-hardening  musl  sabotage  tlsify  passwords  /  crypt-dev  xvendor  /  Bugtraq  Full-Disclosure  linux-kernel  linux-netdev  linux-ext4  linux-hardening  linux-cve-announce  PHC 
Open Source and information security mailing list archives
 
Hash Suite: Windows password security audit tool. GUI, reports in PDF.
[<prev] [next>] [<thread-prev] [thread-next>] [day] [month] [year] [list]
Date:	Tue,  8 Dec 2015 22:19:30 -0800
From:	Steve Muckle <steve.muckle@...aro.org>
To:	Peter Zijlstra <peterz@...radead.org>,
	Ingo Molnar <mingo@...hat.com>
Cc:	linux-kernel@...r.kernel.org, linux-pm@...r.kernel.org,
	Vincent Guittot <vincent.guittot@...aro.org>,
	Morten Rasmussen <morten.rasmussen@....com>,
	Dietmar Eggemann <dietmar.eggemann@....com>,
	Juri Lelli <Juri.Lelli@....com>,
	Patrick Bellasi <patrick.bellasi@....com>,
	Michael Turquette <mturquette@...libre.com>
Subject: [RFCv6 PATCH 09/10] sched: deadline: use deadline bandwidth in scale_rt_capacity

From: Vincent Guittot <vincent.guittot@...aro.org>

Instead of monitoring the exec time of deadline tasks to evaluate the
CPU capacity consumed by deadline scheduler class, we can directly
calculate it thanks to the sum of utilization of deadline tasks on the
CPU.  We can remove deadline tasks from rt_avg metric and directly use
the average bandwidth of deadline scheduler in scale_rt_capacity.

Based in part on a similar patch from Luca Abeni <luca.abeni@...tn.it>.

Signed-off-by: Vincent Guittot <vincent.guittot@...aro.org>
Signed-off-by: Steve Muckle <smuckle@...aro.org>
---
 kernel/sched/deadline.c | 33 +++++++++++++++++++++++++++++++--
 kernel/sched/fair.c     |  8 ++++++++
 kernel/sched/sched.h    |  2 ++
 3 files changed, 41 insertions(+), 2 deletions(-)

diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index 8b0a15e..9d9eb50 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -43,6 +43,24 @@ static inline int on_dl_rq(struct sched_dl_entity *dl_se)
 	return !RB_EMPTY_NODE(&dl_se->rb_node);
 }
 
+static void add_average_bw(struct sched_dl_entity *dl_se, struct dl_rq *dl_rq)
+{
+	u64 se_bw = dl_se->dl_bw;
+
+	dl_rq->avg_bw += se_bw;
+}
+
+static void clear_average_bw(struct sched_dl_entity *dl_se, struct dl_rq *dl_rq)
+{
+	u64 se_bw = dl_se->dl_bw;
+
+	dl_rq->avg_bw -= se_bw;
+	if (dl_rq->avg_bw < 0) {
+		WARN_ON(1);
+		dl_rq->avg_bw = 0;
+	}
+}
+
 static inline int is_leftmost(struct task_struct *p, struct dl_rq *dl_rq)
 {
 	struct sched_dl_entity *dl_se = &p->dl;
@@ -494,6 +512,9 @@ static void update_dl_entity(struct sched_dl_entity *dl_se,
 	struct dl_rq *dl_rq = dl_rq_of_se(dl_se);
 	struct rq *rq = rq_of_dl_rq(dl_rq);
 
+	if (dl_se->dl_new)
+		add_average_bw(dl_se, dl_rq);
+
 	/*
 	 * The arrival of a new instance needs special treatment, i.e.,
 	 * the actual scheduling parameters have to be "renewed".
@@ -741,8 +762,6 @@ static void update_curr_dl(struct rq *rq)
 	curr->se.exec_start = rq_clock_task(rq);
 	cpuacct_charge(curr, delta_exec);
 
-	sched_rt_avg_update(rq, delta_exec);
-
 	dl_se->runtime -= dl_se->dl_yielded ? 0 : delta_exec;
 	if (dl_runtime_exceeded(dl_se)) {
 		dl_se->dl_throttled = 1;
@@ -1241,6 +1260,8 @@ static void task_fork_dl(struct task_struct *p)
 static void task_dead_dl(struct task_struct *p)
 {
 	struct dl_bw *dl_b = dl_bw_of(task_cpu(p));
+	struct dl_rq *dl_rq = dl_rq_of_se(&p->dl);
+	struct rq *rq = rq_of_dl_rq(dl_rq);
 
 	/*
 	 * Since we are TASK_DEAD we won't slip out of the domain!
@@ -1249,6 +1270,8 @@ static void task_dead_dl(struct task_struct *p)
 	/* XXX we should retain the bw until 0-lag */
 	dl_b->total_bw -= p->dl.dl_bw;
 	raw_spin_unlock_irq(&dl_b->lock);
+
+	clear_average_bw(&p->dl, &rq->dl);
 }
 
 static void set_curr_task_dl(struct rq *rq)
@@ -1556,7 +1579,9 @@ retry:
 	}
 
 	deactivate_task(rq, next_task, 0);
+	clear_average_bw(&next_task->dl, &rq->dl);
 	set_task_cpu(next_task, later_rq->cpu);
+	add_average_bw(&next_task->dl, &later_rq->dl);
 	activate_task(later_rq, next_task, 0);
 	ret = 1;
 
@@ -1644,7 +1669,9 @@ static void pull_dl_task(struct rq *this_rq)
 			resched = true;
 
 			deactivate_task(src_rq, p, 0);
+			clear_average_bw(&p->dl, &src_rq->dl);
 			set_task_cpu(p, this_cpu);
+			add_average_bw(&p->dl, &this_rq->dl);
 			activate_task(this_rq, p, 0);
 			dmin = p->dl.deadline;
 
@@ -1750,6 +1777,8 @@ static void switched_from_dl(struct rq *rq, struct task_struct *p)
 	if (!start_dl_timer(p))
 		__dl_clear_params(p);
 
+	clear_average_bw(&p->dl, &rq->dl);
+
 	/*
 	 * Since this might be the only -deadline task on the rq,
 	 * this is the right place to try to pull some other one
diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
index 4c49f76..ce05f61 100644
--- a/kernel/sched/fair.c
+++ b/kernel/sched/fair.c
@@ -6203,6 +6203,14 @@ static unsigned long scale_rt_capacity(int cpu)
 
 	used = div_u64(avg, total);
 
+	/*
+	 * deadline bandwidth is defined at system level so we must
+	 * weight this bandwidth with the max capacity of the system.
+	 * As a reminder, avg_bw is 20bits width and
+	 * scale_cpu_capacity is 10 bits width
+	 */
+	used += div_u64(rq->dl.avg_bw, arch_scale_cpu_capacity(NULL, cpu));
+
 	if (likely(used < SCHED_CAPACITY_SCALE))
 		return SCHED_CAPACITY_SCALE - used;
 
diff --git a/kernel/sched/sched.h b/kernel/sched/sched.h
index 08858d1..e44c6be 100644
--- a/kernel/sched/sched.h
+++ b/kernel/sched/sched.h
@@ -519,6 +519,8 @@ struct dl_rq {
 #else
 	struct dl_bw dl_bw;
 #endif
+	/* This is the "average utilization" for this runqueue */
+	s64 avg_bw;
 };
 
 #ifdef CONFIG_SMP
-- 
2.4.10

--
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo@...r.kernel.org
More majordomo info at  http://vger.kernel.org/majordomo-info.html
Please read the FAQ at  http://www.tux.org/lkml/

Powered by blists - more mailing lists