[<prev] [next>] [<thread-prev] [thread-next>] [day] [month] [year] [list]
Message-ID: <20171207155005.5852-28-alexander.levin@verizon.com>
Date: Thu, 7 Dec 2017 15:50:18 +0000
From: alexander.levin@...izon.com
To: "linux-kernel@...r.kernel.org" <linux-kernel@...r.kernel.org>,
"stable@...r.kernel.org" <stable@...r.kernel.org>
Cc: Daniel Bristot de Oliveira <bristot@...hat.com>,
Peter Zijlstra <peterz@...radead.org>,
Linus Torvalds <torvalds@...ux-foundation.org>,
"Mike Galbraith" <efault@....de>,
Romulo Silva de Oliveira <romulo.deoliveira@...c.br>,
Steven Rostedt <rostedt@...dmis.org>,
"Thomas Gleixner" <tglx@...utronix.de>,
Tommaso Cucinotta <tommaso.cucinotta@...up.it>,
Ingo Molnar <mingo@...nel.org>, alexander.levin@...izon.com
Subject: [PATCH AUTOSEL for 4.4 028/101] sched/deadline: Make sure the
replenishment timer fires in the next period
From: Daniel Bristot de Oliveira <bristot@...hat.com>
[ Upstream commit 5ac69d37784b237707a7b15d199cdb6c6fdb6780 ]
Currently, the replenishment timer is set to fire at the deadline
of a task. Although that works for implicit deadline tasks because the
deadline is equals to the begin of the next period, that is not correct
for constrained deadline tasks (deadline < period).
For instance:
f.c:
--------------- %< ---------------
int main (void)
{
for(;;);
}
--------------- >% ---------------
# gcc -o f f.c
# trace-cmd record -e sched:sched_switch \
-e syscalls:sys_exit_sched_setattr \
chrt -d --sched-runtime 490000000 \
--sched-deadline 500000000 \
--sched-period 1000000000 0 ./f
# trace-cmd report | grep "{pid of ./f}"
After setting parameters, the task is replenished and continue running
until being throttled:
f-11295 [003] 13322.113776: sys_exit_sched_setattr: 0x0
The task is throttled after running 492318 ms, as expected:
f-11295 [003] 13322.606094: sched_switch: f:11295 [-1] R ==> watchdog/3:32 [0]
But then, the task is replenished 500719 ms after the first
replenishment:
<idle>-0 [003] 13322.614495: sched_switch: swapper/3:0 [120] R ==> f:11295 [-1]
Running for 490277 ms:
f-11295 [003] 13323.104772: sched_switch: f:11295 [-1] R ==> swapper/3:0 [120]
Hence, in the first period, the task runs 2 * runtime, and that is a bug.
During the first replenishment, the next deadline is set one period away.
So the runtime / period starts to be respected. However, as the second
replenishment took place in the wrong instant, the next replenishment
will also be held in a wrong instant of time. Rather than occurring in
the nth period away from the first activation, it is taking place
in the (nth period - relative deadline).
Signed-off-by: Daniel Bristot de Oliveira <bristot@...hat.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@...radead.org>
Reviewed-by: Luca Abeni <luca.abeni@...tannapisa.it>
Reviewed-by: Steven Rostedt (VMware) <rostedt@...dmis.org>
Reviewed-by: Juri Lelli <juri.lelli@....com>
Cc: Linus Torvalds <torvalds@...ux-foundation.org>
Cc: Mike Galbraith <efault@....de>
Cc: Peter Zijlstra <peterz@...radead.org>
Cc: Romulo Silva de Oliveira <romulo.deoliveira@...c.br>
Cc: Steven Rostedt <rostedt@...dmis.org>
Cc: Thomas Gleixner <tglx@...utronix.de>
Cc: Tommaso Cucinotta <tommaso.cucinotta@...up.it>
Link: http://lkml.kernel.org/r/ac50d89887c25285b47465638354b63362f8adff.1488392936.git.bristot@redhat.com
Signed-off-by: Ingo Molnar <mingo@...nel.org>
Signed-off-by: Sasha Levin <alexander.levin@...izon.com>
---
kernel/sched/deadline.c | 9 +++++++--
1 file changed, 7 insertions(+), 2 deletions(-)
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index e984f059e5fc..a428f7e6f5e9 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -510,10 +510,15 @@ static void update_dl_entity(struct sched_dl_entity *dl_se,
}
}
+static inline u64 dl_next_period(struct sched_dl_entity *dl_se)
+{
+ return dl_se->deadline - dl_se->dl_deadline + dl_se->dl_period;
+}
+
/*
* If the entity depleted all its runtime, and if we want it to sleep
* while waiting for some new execution time to become available, we
- * set the bandwidth enforcement timer to the replenishment instant
+ * set the bandwidth replenishment timer to the replenishment instant
* and try to activate it.
*
* Notice that it is important for the caller to know if the timer
@@ -535,7 +540,7 @@ static int start_dl_timer(struct task_struct *p)
* that it is actually coming from rq->clock and not from
* hrtimer's time base reading.
*/
- act = ns_to_ktime(dl_se->deadline);
+ act = ns_to_ktime(dl_next_period(dl_se));
now = hrtimer_cb_get_time(timer);
delta = ktime_to_ns(now) - rq_clock(rq);
act = ktime_add_ns(act, delta);
--
2.11.0
Powered by blists - more mailing lists