lists.openwall.net   lists  /  announce  owl-users  owl-dev  john-users  john-dev  passwdqc-users  yescrypt  popa3d-users  /  oss-security  kernel-hardening  musl  sabotage  tlsify  passwords  /  crypt-dev  xvendor  /  Bugtraq  Full-Disclosure  linux-kernel  linux-netdev  linux-ext4  linux-hardening  linux-cve-announce  PHC 
Open Source and information security mailing list archives
 
Hash Suite: Windows password security audit tool. GUI, reports in PDF.
[<prev] [next>] [<thread-prev] [thread-next>] [day] [month] [year] [list]
Message-ID: <20181023055937.GC27587@codeaurora.org>
Date:   Tue, 23 Oct 2018 11:29:37 +0530
From:   Pavan Kondeti <pkondeti@...eaurora.org>
To:     Vincent Guittot <vincent.guittot@...aro.org>
Cc:     peterz@...radead.org, mingo@...nel.org,
        linux-kernel@...r.kernel.org, rjw@...ysocki.net,
        dietmar.eggemann@....com, Morten.Rasmussen@....com,
        patrick.bellasi@....com, pjt@...gle.com, bsegall@...gle.com,
        thara.gopinath@...aro.org
Subject: Re: [PATCH v4 2/2] sched/fair: update scale invariance of PELT

Hi Vincent,

On Fri, Oct 19, 2018 at 06:17:51PM +0200, Vincent Guittot wrote:
>  
>  /*
> + * The clock_pelt scales the time to reflect the effective amount of
> + * computation done during the running delta time but then sync back to
> + * clock_task when rq is idle.
> + *
> + *
> + * absolute time   | 1| 2| 3| 4| 5| 6| 7| 8| 9|10|11|12|13|14|15|16
> + * @ max capacity  ------******---------------******---------------
> + * @ half capacity ------************---------************---------
> + * clock pelt      | 1| 2|    3|    4| 7| 8| 9|   10|   11|14|15|16
> + *
> + */
> +void update_rq_clock_pelt(struct rq *rq, s64 delta)
> +{
> +
> +	if (is_idle_task(rq->curr)) {
> +		u32 divider = (LOAD_AVG_MAX - 1024 + rq->cfs.avg.period_contrib) << SCHED_CAPACITY_SHIFT;
> +		u32 overload = rq->cfs.avg.util_sum + LOAD_AVG_MAX;
> +		overload += rq->avg_rt.util_sum;
> +		overload += rq->avg_dl.util_sum;
> +
> +		/*
> +		 * Reflecting some stolen time makes sense only if the idle
> +		 * phase would be present at max capacity. As soon as the
> +		 * utilization of a rq has reached the maximum value, it is
> +		 * considered as an always runnnig rq without idle time to
> +		 * steal. This potential idle time is considered as lost in
> +		 * this case. We keep track of this lost idle time compare to
> +		 * rq's clock_task.
> +		 */
> +		if (overload >= divider)
> +			rq->lost_idle_time += rq_clock_task(rq) - rq->clock_pelt;
> +

I am trying to understand this better. I believe we run into this scenario, when
the frequency is limited due to thermal/userspace constraints. Lets say
frequency is limited to Fmax/2. A 50% task at Fmax, becomes 100% running at
Fmax/2. The utilization is built up to 100% after several periods.
The clock_pelt runs at 1/2 speed of the clock_task. We are loosing the idle time
all along. What happens when the CPU enters idle for a short duration and comes
back to run this 100% utilization task?

If the above block is not present i.e lost_idle_time is not tracked, we
stretch the idle time (since clock_pelt is synced to clock_task) and the
utilization is dropped. Right?

With the above block, we don't stretch the idle time. In fact we don't
consider the idle time at all. Because,

idle_time = now - last_time;

idle_time = (rq->clock_pelt - rq->lost_idle_time) - last_time
idle_time = (rq->clock_task - rq_clock_task + rq->clock_pelt_old) - last_time
idle_time = rq->clock_pelt_old - last_time

The last time is nothing but the last snapshot of the rq->clock_pelt when the
task entered sleep due to which CPU entered idle.

Can you please explain the significance of the above block with an example?

> +
> +		/* The rq is idle, we can sync to clock_task */
> +		rq->clock_pelt  = rq_clock_task(rq);
> +
> +
> +	} else {
> +		/*
> +		 * When a rq runs at a lower compute capacity, it will need
> +		 * more time to do the same amount of work than at max
> +		 * capacity: either because it takes more time to compute the
> +		 * same amount of work or because taking more time means
> +		 * sharing more often the CPU between entities.
> +		 * In order to be invariant, we scale the delta to reflect how
> +		 * much work has been really done.
> +		 * Running at lower capacity also means running longer to do
> +		 * the same amount of work and this results in stealing some
> +		 * idle time that will disturb the load signal compared to
> +		 * max capacity; This stolen idle time will be automaticcally
> +		 * reflected when the rq will be idle and the clock will be
> +		 * synced with rq_clock_task.
> +		 */
> +
> +		/*
> +		 * scale the elapsed time to reflect the real amount of
> +		 * computation
> +		 */
> +		delta = cap_scale(delta, arch_scale_freq_capacity(cpu_of(rq)));
> +		delta = cap_scale(delta, arch_scale_cpu_capacity(NULL, cpu_of(rq)));
> +
> +		rq->clock_pelt += delta;

AFAICT, the rq->clock_pelt is used for both utilization and load. So the load
also becomes a function of CPU uarch now. Is this intentional?

Thanks,
Pavan
-- 
Qualcomm India Private Limited, on behalf of Qualcomm Innovation Center, Inc.
Qualcomm Innovation Center, Inc. is a member of Code Aurora Forum, a Linux Foundation Collaborative Project.

Powered by blists - more mailing lists