lists.openwall.net   lists  /  announce  owl-users  owl-dev  john-users  john-dev  passwdqc-users  yescrypt  popa3d-users  /  oss-security  kernel-hardening  musl  sabotage  tlsify  passwords  /  crypt-dev  xvendor  /  Bugtraq  Full-Disclosure  linux-kernel  linux-netdev  linux-ext4  linux-hardening  linux-cve-announce  PHC 
Open Source and information security mailing list archives
 
Hash Suite: Windows password security audit tool. GUI, reports in PDF.
[<prev] [next>] [<thread-prev] [thread-next>] [day] [month] [year] [list]
Date:   Sun, 6 Feb 2022 14:43:29 +0100
From:   Peter Zijlstra <peterz@...radead.org>
To:     Tadeusz Struk <tadeusz.struk@...aro.org>
Cc:     Ingo Molnar <mingo@...hat.com>, Juri Lelli <juri.lelli@...hat.com>,
        Vincent Guittot <vincent.guittot@...aro.org>,
        Dietmar Eggemann <dietmar.eggemann@....com>,
        Steven Rostedt <rostedt@...dmis.org>,
        Ben Segall <bsegall@...gle.com>, Mel Gorman <mgorman@...e.de>,
        Daniel Bristot de Oliveira <bristot@...hat.com>,
        Zhang Qiao <zhangqiao22@...wei.com>, stable@...r.kernel.org,
        linux-kernel@...r.kernel.org,
        syzbot+af7a719bc92395ee41b3@...kaller.appspotmail.com
Subject: Re: [PATCH v5] sched/fair: Fix fault in reweight_entity

On Thu, Feb 03, 2022 at 08:18:46AM -0800, Tadeusz Struk wrote:
> Syzbot found a GPF in reweight_entity. This has been bisected to commit
> 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid sched_task_group")
> 
> There is a race between sched_post_fork() and setpriority(PRIO_PGRP)
> within a thread group that causes a null-ptr-deref in reweight_entity()
> in CFS. The scenario is that the main process spawns number of new
> threads, which then call setpriority(PRIO_PGRP, 0, -20), wait, and exit.
> For each of the new threads the copy_process() gets invoked, which adds
> the new task_struct and calls sched_post_fork() for it.
> 
> In the above scenario there is a possibility that setpriority(PRIO_PGRP)
> and set_one_prio() will be called for a thread in the group that is just
> being created by copy_process(), and for which the sched_post_fork() has
> not been executed yet. This will trigger a null pointer dereference in
> reweight_entity(), as it will try to access the run queue pointer, which
> hasn't been set. This results it a crash as shown below:
> 

> 
> Before the mentioned change the cfs_rq pointer for the task  has been
> set in sched_fork(), which is called much earlier in copy_process(),
> before the new task is added to the thread_group.
> Now it is done in the sched_post_fork(), which is called after that.
> To fix the issue the remove the update_load param from the
> update_load param() function and call reweight_task() only if the task
> flag doesn't have the TASK_NEW flag set.
> 

> Link: https://syzkaller.appspot.com/bug?id=9d9c27adc674e3a7932b22b61c79a02da82cbdc1
> Fixes: 4ef0c5c6b5ba ("kernel/sched: Fix sched_fork() access an invalid sched_task_group")
> Reported-by: syzbot+af7a719bc92395ee41b3@...kaller.appspotmail.com
> Reviewed-by: Dietmar Eggemann <dietmar.eggemann@....com>
> Signed-off-by: Tadeusz Struk <tadeusz.struk@...aro.org>

Thanks!

Powered by blists - more mailing lists

Powered by Openwall GNU/*/Linux Powered by OpenVZ