[<prev] [next>] [thread-next>] [day] [month] [year] [list]
Message-Id: <20240702083839.176996-1-aboorvad@linux.ibm.com>
Date: Tue, 2 Jul 2024 14:08:39 +0530
From: Aboorva Devarajan <aboorvad@...ux.ibm.com>
To: tj@...nel.org, void@...ifault.com
Cc: aboorvad@...ux.ibm.com, linux-kernel@...r.kernel.org
Subject: [PATCH v2 sched_ext/for-6.11] sched_ext: Documentation: Remove mentions of scx_bpf_switch_all
Updated sched_ext doc to eliminate references to scx_bpf_switch_all,
which has been removed in recent sched_ext versions.
Signed-off-by: Aboorva Devarajan <aboorvad@...ux.ibm.com>
---
Documentation/scheduler/sched-ext.rst | 24 +++++++++++++-----------
1 file changed, 13 insertions(+), 11 deletions(-)
diff --git a/Documentation/scheduler/sched-ext.rst b/Documentation/scheduler/sched-ext.rst
index 497eeaa5ecbe..a707d2181a77 100644
--- a/Documentation/scheduler/sched-ext.rst
+++ b/Documentation/scheduler/sched-ext.rst
@@ -48,13 +48,16 @@ sched_ext is used only when the BPF scheduler is loaded and running.
If a task explicitly sets its scheduling policy to ``SCHED_EXT``, it will be
treated as ``SCHED_NORMAL`` and scheduled by CFS until the BPF scheduler is
-loaded. On load, such tasks will be switched to and scheduled by sched_ext.
+loaded.
-The BPF scheduler can choose to schedule all normal and lower class tasks by
-calling ``scx_bpf_switch_all()`` from its ``init()`` operation. In this
-case, all ``SCHED_NORMAL``, ``SCHED_BATCH``, ``SCHED_IDLE`` and
-``SCHED_EXT`` tasks are scheduled by sched_ext. In the example schedulers,
-this mode can be selected with the ``-a`` option.
+When the BPF scheduler is loaded and ``SCX_OPS_SWITCH_PARTIAL`` is not set
+in ``ops->flags``, all ``SCHED_NORMAL``, ``SCHED_BATCH``, ``SCHED_IDLE``, and
+``SCHED_EXT`` tasks are scheduled by sched_ext.
+
+However, when the BPF scheduler is loaded and ``SCX_OPS_SWITCH_PARTIAL`` is
+set in ``ops->flags``, only tasks with the ``SCHED_EXT`` policy are scheduled
+by sched_ext, while tasks with ``SCHED_NORMAL``, ``SCHED_BATCH`` and
+``SCHED_IDLE`` policies are scheduled by CFS.
Terminating the sched_ext scheduler program, triggering :kbd:`SysRq-S`, or
detection of any internal error including stalled runnable tasks aborts the
@@ -109,7 +112,7 @@ Userspace can implement an arbitrary BPF scheduler by loading a set of BPF
programs that implement ``struct sched_ext_ops``. The only mandatory field
is ``ops.name`` which must be a valid BPF object name. All operations are
optional. The following modified excerpt is from
-``tools/sched/scx_simple.bpf.c`` showing a minimal global FIFO scheduler.
+``tools/sched_ext/scx_simple.bpf.c`` showing a minimal global FIFO scheduler.
.. code-block:: c
@@ -156,13 +159,12 @@ optional. The following modified excerpt is from
scx_bpf_dispatch(p, SCX_DSQ_GLOBAL, SCX_SLICE_DFL, enq_flags);
}
- s32 BPF_STRUCT_OPS(simple_init)
+ s32 BPF_STRUCT_OPS_SLEEPABLE(simple_init)
{
/*
- * All SCHED_OTHER, SCHED_IDLE, and SCHED_BATCH tasks should
- * use sched_ext.
+ * By default, all SCHED_EXT, SCHED_OTHER, SCHED_IDLE, and
+ * SCHED_BATCH tasks should use sched_ext.
*/
- scx_bpf_switch_all();
return 0;
}
--
2.25.1
Powered by blists - more mailing lists